Stakeholder Involvement, Resource Availability and Performance of Road Projects Under Kampala Capital City Authority, Uganda
Abstract
This study examines the impact of stakeholder involvement and availability of resources on the performance of Kampala Capital City Authority (KCCA)-managed road works in Uganda. Road building is essential to the acceleration of economic growth and the quality of life, but delays and cost escalation threaten its success. The study aims to understand the extent to which the two variables contribute to ensuring the success of projects. Data were gathered over two months from 62 out of 76 road projects, including project managers, division councillors, and KCCA supervision team members. Qualitative and quantitative approaches were used, including surveys and questionnaires, and statistical analysis was done using SPSS. The findings reveal a positive correlation between stakeholder participation, available resources, and project performance. All these variables together explain 33.3% of the difference in the quality of the projects done. It emphasizes the importance of effective stakeholder engagement and adequate resources to ensure road projects are completed within time, budget, and quality. It proposes implementing formal policies for stakeholder interaction, improving accountability, encouraging public-private partnerships, and merging stakeholder feedback with resource planning. The study further calls upon additional research to facilitate comparison with other regions of the globe to determine better ways of improving project performance.Downloads
References
Aboginije, A., Aigbavboa, C., Thwala, W., & Samuel, S. (2020). Determining the impact of construction and demolition waste reduction practices on green building projects in Gauteng Province, South Africa. Proceedings of International Engineering & Operations Management, Dubai, UAE, 10–12.
Alaloul, W. S., Musarat, M. A., Mehmood, H., & Altaf, M. (2021). Journal of Civil Engineering, 12(1), 32–38.
Alvanchi, A., Baniassadi, F., Shahsavari, M., & Kashani, H. (2021). Engineering, Construction and Architectural Management, 28(10), 3144–3163.
Aradukunda, A., & Sikubwabo, C. (2024). Influence of financial resources management on project performance in public institutions: A case of Kigali City (2018-2022). African Journal of Empirical Research, 5(2), 411–425.
Asiimwe, L. (2020). Resource management and employee performance of Kampala Capital City Authority (KCCA) [Doctoral dissertation, Kampala International University].
Baensch-Baltruschat, B., Kocher, B., Kochleus, C., Stock, F., & Reifferscheid, G. (2021). Tyre and road wear particles: a calculation of generation, transport, and release to water and soil with special regard to German roads. Science of the Total Environment, 752, 141939.
Cheserek, J. K., & Oscar, S. (2023). Journal of Business, Economics and Management Research Studies, 1(2), 84–92.
Chukwuma-Eke, E. C., Ogunsola, O. Y., & Isibor, N. J. (2022). International Journal of Multidisciplinary Research and Growth Evaluation, 2(1), 823–834.
Eaton, W. M., Brasier, K. J., Burbach, M. E., Whitmer, W., Engle, E. W., Burnham, M., ... & Weigle, J. (2021). Society & Natural Resources, 34(8), 1111–1132.
Elong, S. (2020). Assessment of the challenges and effects of delays in compulsory land acquisition on the performance of road construction projects in Uganda [Doctoral dissertation, Kyambogo University].
Freeman, R. E. (2023). The politics of stakeholder theory: Some future directions. In Selected works on stakeholder theory and business ethics. Cham: Springer.
Gamariel, M., & David, I. (2021). Social Science Learning Education Journal, 6(10), 576–583.
Ggoobi, R., Lukwago, D., & Bogere, G. (2020). Public expenditure governance in the roads sector. ACODE.
Hamdan, H. A., Andersen, P. H., & De Boer, L. (2021). Stakeholder collaboration in sustainable neighborhood projects—A review and research agenda. Sustainable Cities and Society, 68, 102776.
Ili?, J. (2021). European Project Management Journal, 11(1), 37–47.
Jiang, H., Luo, Y., Xia, J., Hitt, M., & Shen, J. (2023). Global Strategy Journal, 13(1), 3–57.
Kamarkor, A. M. B., Sang, P. K., & Nzuki, D. (2024). East African Journal of Business and Economics, 7(1), 217–230.
Karuga, S., Mutuku, M., & Sang, P. (2024). International Journal of Research in Business and Social Science, 13(4), 223–229.
Khan, A., Waris, M., Panigrahi, S., Sajid, M. R., & Rana, F. (2021). Journal of Management in Engineering, 37(2), 04020112.
Kipchirchir, K. J. (2022). Resource management and performance of road construction projects: A case of Kenya National Highways Authority, Nairobi City County, Kenya [Doctoral dissertation, Kenyatta University].
Kordi, N. E., Belayutham, S., & Che Ibrahim, C. K. I. (2021). Construction Management and Economics, 39(6), 513–532.
Kujukira, M. (2022). Appraisal of road maintenance management techniques used by KCCA [Doctoral dissertation, Makerere University].
Lee, C. (2021). International Review of Public Administration, 26(2), 156–174.
Lucien, N. I., & Amolo, A. E. J. (2025). International Journal of Finance & Banking Studies, 14(1).
Lwanga, M. N. (2021). Influence of project planning on implementation of urban road projects in Kenya [Doctoral dissertation, University of Nairobi].
Lyulyov, O., Chygryn, O., Pimonenko, T., & Kwilinski, A. (2023). Sustainability, 15(9), 7249.
Majani, E. B., & Senelwa, A. (2025). Stakeholder involvement in decision-making on the performance of road construction projects in Bungoma County, Kenya.
Manishimwe, J. (2020). Effect of contract management on the performance of feeder roads construction projects [Doctoral dissertation, College of Science and Technology].
Matsiko, J. M., Nduhura, A., Settumba, J. P., Phuyal, M., & Motadi, S. M. (2024). African Journal of E-commerce, Logistics and Transport Studies, 1(2), 69–91.
Matu, J., Kyalo, D., Mbugua, J., & Mulwa, A. (2020). Journal of Building Construction and Planning Research, 8(1), 73–91.
McGahan, A. M. (2021). Journal of Management, 47(7), 1734–1756.
Muntu, D., Setyawati, R., Riantini, L. S., & Ichsan, M. (2021). Effect of human resources management and advances to improve construction project performance. Physics and Chemistry of the Earth, Parts A/B/C, 122, 103000.
Murphy, J., Qureshi, O., Endale, T., Esponda, G. M., Pathare, S., Eaton, J., ... & Ryan, G. (2021). Barriers and drivers to stakeholder engagement in global mental health projects. International Journal of Mental Health Systems, 15, 1–13.
Mutabazi, M. C. (2021). Integration of World Bank environmental and social standards in planning and implementation of road infrastructure projects: Case of Uganda National Roads Authority.
Mwelu, N., Davis, P. R., Ke, Y., & Watundu, S. (2020). Journal of Public Procurement, 20(3), 209–233.
Nnadi, E. O. E., & Oyama, E. O. (2023). European Journal of Historical Research, 5(2), 1–14.
Nuwagaba, I., Molokwane, T., Nduhura, A., Tshombe, L. M., & Muhwezi, R. (2022). International Journal of Supply Chain Management, 11(1), 34–44.
Okaka, M. M. (2023). Stakeholder management and completion of Class B road construction projects in Kiambu County, Kenya [Doctoral dissertation, University of Nairobi].
Ozdemir, S., de Arroyabe, J. C. F., Sena, V., & Gupta, S. (2023). Stakeholder diversity and collaborative innovation: Integrating the resource-based view with stakeholder theory. Journal of Business Research, 164, 113955.
Pfister, J. A., Peda, P., & Otley, D. (2023). Qualitative Research in Accounting & Management, 20(2), 201–228.
Prebani?, K. R., & Vukomanovi?, M. (2023). Buildings, 13(7), 1785.
Rane, S. B., Thakker, S. V., & Kant, R. (2021). Management of Environmental Quality: An International Journal, 32(6), 1166–1191.
Robert, T., Charles, M., & Aisha, K. (2021). African Journal of Educational Management, Teaching and Entrepreneurship Studies, 2(1), 1–18.
Ruth, N. (2022). Contract management practices and success of road construction projects in Uganda [Doctoral dissertation, Kampala International University].
Shaukat, M. B., Latif, K. F., Sajjad, A., & Eweje, G. (2022). Sustainable Development, 30(1), 58–75.
Simon, N. O., & Mwenda, M. N. (2021). European Journal of Business and Management Research, 6(1), 32–37.
Tabitha, M. W., & Sang, P. (2025). Effect of physical resource capability on performance of road construction projects funded by Embu County Government in Kenya.
Tengan, C., & Aigbavboa, C. (2017). Level of stakeholder engagement and participation in monitoring and evaluation of construction projects in Ghana. Procedia Engineering, 196, 630–637.
Waris, M., Khan, A., Abideen, A. Z., Sorooshian, S., & Ullah, M. (2022). Journal of Engineering, Project & Production Management, 12(3).
Wojewnik-Filipkowska, A., Dziadkiewicz, A., Dryl, W., Dryl, T., & B?ben, R. (2021). Obstacles and challenges in applying stakeholder analysis to infrastructure projects: Is there a gap between stakeholder theory and practice? Journal of Property Investment & Finance, 39(3), 199–222.
Yang, R. J., & Shen, G. Q. (2015). Journal of Management in Engineering, 31(4), 04014064.
Yang, R. J., Jayasuriya, S., Gunarathna, C., Arashpour, M., Xue, X., & Zhang, G. (2018). Engineering, Construction and Architectural Management, 25(6), 690–706.
Copyright (c) 2025 Junior Jim Mugisha, Alex Twinomuhwezi, Benjamin Musiita

This work is licensed under a Creative Commons Attribution 4.0 International License.
Author (s) should affirm that the material has not been published previously. It has not been submitted and it is not under consideration by any other journal. At the same time author (s) need to execute a publication permission agreement to assume the responsibility of the submitted content and any omissions and errors therein. After submission of a revised paper, the editorial team edits and formats manuscripts to bring uniformity and standardization in published material.
This work will be licensed under Creative Commons Attribution 4.0 International (CC BY 4.0) and under condition of the license, users are free to read, copy, remix, transform, redistribute, download, print, search or link to the full texts of articles and even build upon their work as long as they credit the author for the original work. Moreover, as per journal policy author (s) hold and retain copyrights without any restrictions.