Effect of Calculation of Cost of Production on Selling Price of Products Manufacturing Companies in Papua (Case Study CV. Sagita Grafika)
Abstract
This study aims to determine how the effect of calculating the cost of an order made by the company and the method of calculation of full costing of the product selling price fixing mold. The data used is primary data, order data produced in the period from January 2013 to December 2013, the secondary data obtained from interviews and literature. From these results it can be seen that CV. Sagita Grafika calculate the cost of the product by using the order cost method that produces cost price and the selling price that is incompatible with existing theory, in which the charging of indirect labor and overhead costs shared equally on all types of orders in the amount of Rp. 11.78825 million for indirect labor costs and Rp. 3.1243 million for overhead costs so that volume orders will bear fewer overhead costs equal to the volume of orders more. By using a full costing analysis generated calculation method that the volume of orders that more will earn imposition overhead costs more, because in this calculation loading overhead costs charged by direct labor hours incurred for each order. So that orders with a total volume that many will use a lot of labor hours and vice versa. So in this study that most large orders received charging overhead is the order BS-02 Rp. 31,115,590.92 and most orders received little overhead loading is KK-01 orders in the amount of Rp. 2,208,622.32. Results of a comparison between the cost of the company with the full costing is the total cost of less Rp. 27,499,540.57, the selling price of Rp. 5,866,543.90, while the larger profit generated by using the full costing method that is Rp. 21,632,996.67Downloads
References
Hansen & Mowen. (2003). Manajemen Biaya, Buku I, Edisi Pertama, Salemba Empat, Jakarta. Hansen & Mowen. (2006). Akuntansi Manajemen, Accounting Management Jakarta: Salemba Empat. Mardiasmo. (1994). Akuntansi Biaya: Penentuan Harga Pokok Produksi Edisi pertama. Yogyakarta. Mulyadi. (2001). Akuntansi Manajemen Konsep, Manfaat dan Rekayasa, Edisi 3, Jakarta, Salemba Empat. Mulyadi. (2004). Akuntansi Manajemen Konsep, Manfaat & Rekayasa Jakarta : Salemba Empat Mulyadi. (2005). Akuntansi Biaya, Edisi Kelima, Cetakan Ketujuh, Unit Penerbit dan Percetakan (UPP) AMP, YKPN, Yogyakarta. Mulyadi. (2007). Sistem Akuntansi, Jakarta, Salemba Empat Mursyidi. (2008). Akuntansi biaya: Conventional costing, just in time, dan activity-based costing. Bandung: PT Refika Aditama. Supriyono. (2001). Akuntansi Manajemen 3: Proses Pengendalian Manajemen Edisi 1,Yogyakarta; STIE YKPN Witjaksono, A. (2006). Akuntansi biaya, Yogyakarta: Penerbit Graha Ilmu.
Copyright (c) 2016 Journal of Social and Development Sciences
This work is licensed under a Creative Commons Attribution 4.0 International License.
Author (s) should affirm that the material has not been published previously. It has not been submitted and it is not under consideration by any other journal. At the same time author (s) need to execute a publication permission agreement to assume the responsibility of the submitted content and any omissions and errors therein. After submission of a revised paper, the editorial team edits and formats manuscripts to bring uniformity and standardization in published material.
This work will be licensed under Creative Commons Attribution 4.0 International (CC BY 4.0) and under condition of the license, users are free to read, copy, remix, transform, redistribute, download, print, search or link to the full texts of articles and even build upon their work as long as they credit the author for the original work. Moreover, as per journal policy author (s) hold and retain copyrights without any restrictions.