Determining the Root Causes of Project Delay: A Case Study
Abstract
The study aims to identify and analyze the reason for the project delay in ABC Company located in the heart of Malaysia specializing in oil and gas and oil and gas-related products. The study utilized observation techniques and data from an official report. The observation was done on an ongoing project and the assessment of record was done on previously completed projects. The outcome of such observation was analysed and simplified using a tool namely the Cause and Effect Diagram or Fishbone Diagram. The study found that shortage of manpower, local authority approval, improper planning, and the COVID-19 pandemic as the root causes that led to project delay.
Downloads
References
Agyekum-Mensah, G., & Knight, A. D. (2017). The professionals’ perspective on the causes of project delay in the construction industry. Engineering, Construction and Architectural Management, 24(5), 828–841. https://doi.org/10.1108/ECAM-03-2016-0085 DOI: https://doi.org/10.1108/ECAM-03-2016-0085
Al Jashaami, M. (2021). Improving Delay Management of Construction Projects by Creating a Systematic Scoring Scale to Minimise/Avoid Delays.
Al-Mohammad, M., & Jamaludin, O. (2018a). A review of causes of delay in construction projects. International Journal of Engineering & Technology, 7(4), 5078–5083. Etr45 https://doi.org/10.14419/ijet.v7i4.19506
Ansari, A. M., Syed, D. R., & Ahmad, K. (2019). Study on the causes of delay in a construction project and recommendation (Vol. 5). www.ijariie.com
Azli Mohd-Rahim, F., Safwah Mohd-Yusoff, N., Chen, W., Zainon, N., Yusoff, S., & Deraman, R. (2016). The Challenge of Labour Shortage For Sustainable Construction.
de Almeida, E. L. G., da Silva Feitoza, V. A., Carvalho, M. T. M., Piña, A. B. S., Araújo, L. G., & Aidar, L. A. G. (2021). Study of delays in constructions: A managerial point of view of private companies in Brasilia, Brazil. Gestao e Producao, 28(3). https://doi.org/10.1590/1806-9649-2021V28E5194 DOI: https://doi.org/10.1590/1806-9649-2021v28e5194
Gara, J. A., Zakaria, R., Aminudin, E., Yahya, K., Sam, A. R. M., Loganathan, Munikanan, V., Yahya, M. A., Wahi, N., & Shamsuddin, S. M. (2022). Effects of the COVID-19 Pandemic on Construction Work Progress: An On-Site Analysis from the Sarawak Construction Project, Malaysia. Sustainability (Switzerland), 14(10). https://doi.org/10.3390/su14106007 DOI: https://doi.org/10.3390/su14106007
G?uszak, M., & Les?niak, A. (2015). Construction Delays in Clients Opinion - Multivariate Statistical Analysis. Procedia Engineering, 123, 182–189. https://doi.org/10.1016/j.proeng.2015.10.075 DOI: https://doi.org/10.1016/j.proeng.2015.10.075
Haas, O., & Markovi?, P. (2021). Negative Effects Caused by COVID-19 on Critical Path of Construction Projects. SHS Web of Conferences, 115, 03005. https://doi.org/10.1051/shsconf/202111503005 DOI: https://doi.org/10.1051/shsconf/202111503005
Hamzah, N., Khoiry, M. A., Arshad, I., Tawil, N. M., & Che Ani, A. I. (2011). Cause of construction delay - Theoretical framework. Procedia Engineering, 20, 490–495. https://doi.org/10.1016/j.proeng.2011.11.192 DOI: https://doi.org/10.1016/j.proeng.2011.11.192
Haseeb, M., Bibi, A., & Rabbani, W. (2011). Causes and Effects of Delays in Large Construction Projects of Pakistan. In Arabian Journal of Business and Management Review (Vol. 1, Issue 4).
Khahro, S. H., & Memon, Z. A. (2018). Non Excusable Delays in Construction Industry: A Causal Study. Technology & Applied Science Research (Vol. 8, Issue 6). www.etasr.com DOI: https://doi.org/10.48084/etasr.2335
Liliana, L. (2016). A new model of the Ishikawa diagram for quality assessment. IOP Conference Series: Materials Science and Engineering, 161(1). https://doi.org/10.1088/1757-899X/161/1/012099 DOI: https://doi.org/10.1088/1757-899X/161/1/012099
Mofleh, I. M. (Al-H. H. (2021). Causes for Delays in Municipal Projects in Jordan: A Case Study of the Zarqa Municipality. International Journal of Academic Research in Business and Social Sciences, 11(7). https://doi.org/10.6007/ijarbss/v11-i7/10509 DOI: https://doi.org/10.6007/IJARBSS/v11-i7/10509
Mohd-Rahim, F. A., Mohd-Yusoff, N. S., Chen, W., Zainon, N., Yusoff, S., & Deraman, R. (2016). The challenge of labor shortage for sustainable construction. Planning Malaysia, 5, 77–88. Malaysian Institute Of Planners. https://doi.org/10.21837/pmjournal.v14.i5.194 DOI: https://doi.org/10.21837/pm.v14i5.194
N Alenezi, T. A. (2020). Covid-19 Causes Of Delays On Construction Projects In Kuwait. In Article in International Journal of Engineering Research and General Science. https://www.researchgate.net/publication/344604183
Nabilla, S., Hisham, A., & Yahya, K. (n.d.). Causes and Effects of Delays in Construction Industry.
Ren, Z., Atout, M., & Jones, J. (2008). Association of Researchers in Construction Management.
Romzi, N. A., & Doh, S. I. (2022). Underlying Causes of Construction Project Delay: A Review. 2, 7–11. https://doi.org/10.15282/construction.v2i2.7775 DOI: https://doi.org/10.15282/construction.v2i2.7775
Satya, S. (2016). The Application of Fishbone Diagram The Application of Fishbone Diagram Analysis to Improve School Quality. 59 DINAMIKA ILMU, 16(1). DOI: https://doi.org/10.21093/di.v16i1.262
Serrador, P., & Turner, R. (2015). The relationship between project success and project efficiency. Project Management Journal, 46(1), 30–39. https://doi.org/10.1002/pmj.21468 DOI: https://doi.org/10.1002/pmj.21468
Shah Ali, A., Smith, A., Pitt, M., & Hong Choon, C. (n.d.). Contractors’ Perception of Factors Contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia.
Tariq, J., & Gardezi, S. S. (2022). Study the delays and conflicts for construction projects and their mutual relationship: A review. Ain Shams Engineering Journal. Ain Shams University. https://doi.org/10.1016/j.asej.2022.101815 DOI: https://doi.org/10.1016/j.asej.2022.101815
Wahdan, M. I., M Abu Yousef Zuhair Fayez, M. S., Arabia, S., & M Farid, A. T. (2019). Study and Assessment of the Reasons for Project Delay or Stalled from Project Management View.
Yap, J. B. H., Goay, P. L., Woon, Y. B., & Skitmore, M. (2021). Revisiting critical delay factors for construction: Analysing projects in Malaysia. Alexandria Engineering Journal, 60(1), 1717–1729. https://doi.org/10.1016/j.aej.2020.11.021 DOI: https://doi.org/10.1016/j.aej.2020.11.021
Yin, L. J., Zainal, R., Kasim, N., Meryam, S., & Musa, S. (2022a). Study of Construction Project Delay Due to COVID-19 Pandemic in Construction Industry. Research in Management of Technology and Business, 3(1), 537–550. https://doi.org/10.30880/rmtb.2022.03.01.040
Yin, L. J., Zainal, R., Kasim, N., Meryam, S., & Musa, S. (2022b). Study of Construction Project Delay Due to COVID-19 Pandemic in Construction Industry. Research in Management of Technology and Business, 3(1), 537–550. https://doi.org/10.30880/rmtb.2022.03.01.040 DOI: https://doi.org/10.22452/jscp.sp2022no1.1
Copyright (c) 2024 Saiful Azmir Bin Kasdi Abd Rahim, Mohd Hafiz bin Zulfakar, Rumaizah Binti Ruslan
This work is licensed under a Creative Commons Attribution 4.0 International License.
Author (s) should affirm that the material has not been published previously. It has not been submitted and it is not under consideration by any other journal. At the same time author (s) need to execute a publication permission agreement to assume the responsibility of the submitted content and any omissions and errors therein. After submission of revised paper in the light of suggestions of the reviewers, the editorial team edits and formats manuscripts to bring uniformity and standardization in published material.
This work will be licensed under Creative Commons Attribution 4.0 International (CC BY 4.0) and under condition of the license, users are free to read, copy, remix, transform, redistribute, download, print, search or link to the full texts of articles and even build upon their work as long as they credit the author for the original work. Moreover, as per journal policy author (s) hold and retain copyrights without any restrictions.