Significant Factors Influencing Quality Assurance Practices in Small and Medium-Sized Construction Projects in South Africa

  • Kgashane Stephen Nyakala Tshwane University of Technology, South Africa
  • Thinandavha Thomas Munyai Tshwane University of Technology, South Africa
  • Jan-Harm Pretorius University of Johannesburg, South Africa
  • Andre Vermeulen University of Johannesburg, South Africa
Keywords: South Africa, SME construction projects, quality assurance practice, road construction

Abstract

Although implementing quality assurance (QA) processes in construction play an important role in the South African economy has been acknowledged. However, constructions SMEs are faced with difficulties in improving rural road infrastructure and high-quality roads. Additionally, past research has failed to reach consensus on the construction process and socioeconomic settings in previously disadvantaged areas in South Africa, including the factors influencing negatively the performance of such factors. This research examines what factors facilitate or inhibit the success of construction SMEs and what actions can be taken to being distressed construction SMEs under control. The study adopted a quantitative research approach in which a three-section questionnaire was administered to 160 purposively chosen road- building experts in a South African construction SMEs. The questionnaire was structured into three parts, which sought the participants’ profile, identified the quality assurance practices (QAPs) incorporated in the construction SMEs’ road building programmes, and identified the factors that negatively influence the implementation of QA processes. Data was analysed using the Statistical Package for the Social Sciences (SPSS) version 22. Furthermore, to determine the reliability of the various constructs, mean scores, descriptive statistics and standard deviations were obtained. The empirical findings established eight QAPs that were reliable and valid for implementation processes that can control or minimise their causes of poor quality in projects undertaken by construction SMEs, level of skill acquisition; project planning and control techniques; project construction design; process implementation and process improvement; financial management; organisational structures; involvement of people; and quality standards and measurements. The eight factors attained high Cronbach Alpha values above the recommended 0.70 which indicates high internal consistencies among the sub-scales. Findings from this study should be useful to managers in similar environments may use the results of this study as either diagnostic tools or as a reference benchmark for strategic interventions in solving construction projects related problems. Furthermore, the researchers also recommend that these practices are for quality assurance in construction projects undertaken by SMEs in South Africa.

Downloads

Download data is not yet available.

References

Ahadzie, D. K., Proverbs, D. G. & Olomolaiye. (2007). Critical success criteria for mass housing building projects in developing countries. International Journal of Project Management, 34, 806-818.
Aigbavboa, C. O. & Thwala, W. D. (2014). Challenges faced blacked owned small and medium construction companies: A case study of Nelspruit-Mbombela Municipality, South Africa. Journal of Economics and Behavioural Studies, 6(10), 771-778.
Arditi, D. & Gunaydin, H. M. (1997). Total quality management in the construction process. International Journal of Project Management, 15(4), 235-243.
Aziz, R. F. & Abdel-Hakam, A. A. (2016). Exploring delay causes in road construction projects in Egypt. Alexandria Engineering Journal, 55, 1515-1539.
Badu, E. & Owusu-Manu, D. (2011). An overview of construction activities in Kumasi, in Adarkwa, K.K. (Ed). The Future of the Tree-Towards Development and Growth, 1st, 270-289.
Basu, R. (2004). Implementing quality: A practical guide to tools and techniques, enabling the power of operational excellence. UK: Thompson.
Bierman, M., Marnewick, A. & Pretorius, J. H. C. (2013). Productivity management in the South African civil construction industry-factors affecting construction productivity. Journal of the South African Institution of Civil Engineering, 58(3), 37-44.
Construction Industry Development Board (CIDB). (2012). The construction industry as a vehicle for contractor development and transformation.
Dangalazana, T. & Newadi, M. R. (2005). An exploratory study into the challenges facing the emerging contractors involved in the construction of low cost housing in Wells Estate and Ikamv’elihle Townships in the Nelson Mandela Metropolitan, South Africa. World Congress on Housing: Transforming Housing Environment through Design, 27-30.
Fang, D. & Wu, H. (2013). Development of a safety climate interaction (SCI) model for construction projects. Safety Science, 57, 138-149.
Field, A. (2013). Discovering statistics using IBM SPSS statistics. 4th Ed. Thousand Oaks, CA. SAGE Publication.
Fotopoulos, C. B. & Psomas, E. L. (2009). The impact of “soft” and “hard” TQM elements on quality management results. International Journal of Quality & Reliability Management, 26(2), 150-163.
Freeman-Bell, G. & Balkwill, J. (1996). Management in engineering: Principles and practice. UK: Prentice-Hall.
Gardiner, P. D. (2005). Project Management: A Strategic Planning Approach. UK: Palgrave MacMillan Ltd.
George, H. (2016). Eliciting the financial challenges facing emerging contractors in developing countries using the critical incident technique: A case of South African construction industry. Business and Management Horizons, 4(2), 23-33.
Gotzamani, K. D. & Tsiotras, G. D. (2001). An empirical study of the ISO 9000 standards’ contribution towards total quality management. International Journal of Operations Production Management, 21(10), 1326-1342.
Hair, J. F., Black, W. C., Babin, B. J. & Anderson, R. L. (2014). Multivariate data analysis. 5th Ed. Upper Saddle River, NJ, USA: Prentice Hall.
Kaiser, H. (1994). An index of factorial simplicity. Psychometrika, 39, 31-36.
Kam, K. J. & Hamid, A. H. A. (2014). The true motives behind the adoption of QLASSIC- CIS 7:2006. As a quality assurance initiative in construction industry. International Journal of Quality & Reliability, 32(6), 603-616.
Honnakker, P., Carayon, P. & Loushine, T. (2010). Barriers and benefits of quality management in the construction industry: An empirical study. Total Quality Management, 21(2), 953-969.
Kerzner, H. R. (2013). Project management: A systems approach to planning, scheduling, and controlling. New Jersey, USA: John Wiley & Sons.
Krejcie, R. V. & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(3), 607-610.
Kruger, D., Ramphal, R. & Maritz, M. (2014). Operations Management. 3rd Ed. Cape Town: Oxford University Press Southern Africa.
Jarkas, A. M. & Younes, J. H. (2014). Principle factors contributing to construction delays in the State of Qatar. International Journal of Construction Project Management, 6(1), 39-62.
Leedy, P. D. & Ormrod, J. E. (2014). Practical Research: Planning and Design. 10th Ed. UK: Pearson.
Mahmood, S., Ahmed, S. M., Panthi, K. & Kureshi, N. I. (2010). Determining the cost of poor quality and its impact on productivity and profitability. Built Environment Project and Asset Management, 4(3), 296-311.
Martin, A. & Lewis, M. (2014). Pinpointing safety leadership factors for safe construction sites in Trinidad and Tobago. Journal of Construction Engineering and Management, 40(2), 040133046.
Mofokeng, G. & Thwala, W. D. (2012). Mentorship programmes within the Small and Medium Sized Contractor Development Programme: A case study of the Free State Province, South Africa. Journal of Economics and Behavioural Studies, 4(12), 712-722.
Nyakala, K. S., Vermeulen, A., Pretorius, J. H. C. & Munyai, T. (2017). Implementation of quality assurance practices and effectiveness of the road construction industry: A case of South African local municipalities. Proceedings of the 2017 Global Business and Technology Association Conference, 636-650.
Obare, J. O., Kyalo, D. N., Mulwa, A. S. & Mbugua, J. (2016). Implementation process of project control systems and performance of rural roads construction project in Kenya: Role of project team experience diversity. European Scientific Journal, 12(29), 408-422.
Olawale, Y. & Sun, M. (2015). Construction project control in the UK: Current practice, existing problems, and recommendations for future improvement. International Journal of Project Management, 33, 623-637.
Pallant, J. (2013). SPSS, Survival manual: A step-by-step guide to data analysis using IBM, SPSS. 5th ed. London: Allen & Unwin.
Panuwatwanich, K. & Nguyen, T. T. (2017). Influence of organisational culture on total quality management implementation and firm performance: Evidence from the Vietnamese construction industry. Management and Production Engineering Review, 8(1), 5-15.
Rumane, R. J. (2011). Quality management in construction projects. CRC Press Taylor & Francis Group, LCC.
Statistics South Africa. (2017). Statistical release manufacturing: Production and sales (Preliminary) April 2017.
Tabachnick, B. G. & Fidell, L. S. (2007). Using multivariate statistics. 5th Ed. Hillside, NS: Erlbaum.
Teddlie, C. & Tashakkori, A. (2003). Handbook of Mixed Methods in social & behavioural research. SAGE Publications International Educational and Professor Publisher Thousand Oaks. London. New Delhi.
Thorpe, B., Summer, P. & Duncan, J. (1996). Quality Assurance in Construction. Surrey, UK: Gower Publishing Ltd.
Tshivhase, L. & Worku, Z. (2012). Barriers toward the development of emerging contractors in the Limpopo Province. African Journal of Science, Technology, Innovation and Development, 4(1), 41-62.
Van Wyk, L. (2003). A review of the South African construction industry: Economic, regulatory and public sector capacity influences on the construction industry. Pretoria: CSIR.
Vermeulen, A., Nyakala, K. S. & Pretorius, J. H. C. (2018). Development of a road quality assurance measurement tool in construction projects. Proceedings of the 2018 International Conference on Management of Technology (2018 IAMOT). Birmingham, England, 22-26, 1-14.
Windapo, A. O. & Cattel, K. (2013). The South African Construction Industry: Perceptions of key challenges facing its performance, development and growth. Journal of Construction in Developing Countries, 18(2), 65-79.
Published
2019-05-13
How to Cite
Nyakala, K. S., Munyai, T. T., Pretorius, J.-H., & Vermeulen, A. (2019). Significant Factors Influencing Quality Assurance Practices in Small and Medium-Sized Construction Projects in South Africa. Journal of Economics and Behavioral Studies, 11(2(J), 30-44. https://doi.org/10.22610/jebs.v11i2(J).2816
Section
Research Paper